Anyhow, here's what we have done thus far:

Step 1: Demolish Bulkhead


Step 2: Remove Tiles


Step 3: Remove moldy and rotten drywall and insulation


Step 4: Install new fixtures


Step 5: Install new tub enclosure - By the way, as it turns out, standard size for a tub enclosure is 60 inches. I guess it's only fitting that the space that we had to fit it in was 59 inches. We had to notch 1 inch out of 90 year old studs. That was about as pleasant as an outdoor Catholic wedding in New Orleans in July, full mass with tuxedos as dress code!


Step 6: Install Hardware & Hang Drywall


Step 7: Install Vanity



Step 8: Play with Julia - By the way...this picture happened just today. I was using my drill to put in some screws while installing the air conditioner in back and Julia saw me, left the room, got her drill and asked Daddy if she could help! She's SO freakin' cool!



To Be Continued...